02 — Capability · BC-680
Asset & Maintenance
Know every physical asset the operation depends on, keep it running safely and reliably for as long as it earns its keep, and replace it on a plan rather than after it fails.
- Enterprise Asset Management
- EAM
- Maintenance Management
- Physical Asset Lifecycle
In scope
- The asset register — what exists, where it is, what it is worth and who owns it
- Preventive, predictive and corrective maintenance planning and execution
- Spare parts and maintenance materials
- Reliability analysis and asset investment and replacement planning
Out of scope
- IT hardware and software assets (see BC-740)
- Buildings as workplaces and their facilities services (see BC-370)
- Fixed-asset accounting and depreciation (see BC-210)
- Site safety permits and rules that maintenance must follow (see BC-810)
Realized by · 2
- SAP S/4HANA · Asset Managementstrong via BC-680.10
- Oracle Fusion Cloud Applications · Supply Chain and Manufacturingstrong via BC-680.30
Used in · 0
- Not yet placed on a value stream.
Build it · 0
- Nothing in the library points here yet.
Decomposes into · 6
- BC-680.10Asset Register & LifecycleMaintain one trustworthy record of every operational asset from commissioning to disposal, structured so that cost, risk and performance can be rolled up by site, system and class.
- BC-680.20Maintenance Strategy & PlanningDecide how each asset should be maintained — run to failure, on a schedule, on condition — and plan the work so it is done with the right parts, skills and window.
- BC-680.30Maintenance ExecutionCarry out maintenance work safely and to standard, from the request through completion, and record what was found and done so the asset history is worth reading.
- BC-680.40Condition Monitoring & ReliabilityDetect deterioration before it becomes failure, learn from the failures that happen anyway and feed both back into the maintenance strategy so reliability improves year on year.
- BC-680.50Maintenance Materials & SparesHave the right spare part on the shelf when the asset needs it, and no more than that, with the parts tied to the assets and jobs that use them.