03 — Value stream · VS-230
Connect-to-Supply
Carry a request for a new or bigger connection, including rooftop solar, batteries and vehicle chargers, through network studies, design, field works and energization to a premise that is metered and billing. Where Order-to-Activate (VS-140) switches on a communications service, this stream has network studies, physical works and interconnection approval in its path.
- New Service Connection
- Customer Connections
- Interconnection-to-Energize
- Connections Journey
- 01
Take the Request
VS-230.10Capture the site, the load or generation asked for and who pays, and tell the applicant what happens next and when.
- 02
Study the Network
VS-230.20Decide whether the network can take the new load or export as it is, and what reinforcement it needs if not.
- 03
Design & Quote
VS-230.30Turn the study into a buildable design with a cost, the customer's contribution and the connection terms, and get the offer accepted.
- 04
Build the Connection
VS-230.40Secure permits and access, schedule crews and contractors, and build the service and any reinforcement to the design.
- 05
Meter & Energize
VS-230.50Test the new assets, set the meter, energize the supply and record the network as built.
- 06
Start Billing
VS-230.60Open the account on the right tariff and, for customer generation, the export arrangement, so the first bill and credit are right.