02 — Capability · BC-1520.20
Network Commissioning & Energization
Confirm that newly built or rebuilt network is tested, recorded and safe before it is energized or put into service, and that it joins the operational network without surprises.
- Energization
- Charging of Mains
- Network Cut-Over
In scope
- Pre-energization tests and inspection
- Switching requests to connect new network
- As-built updates to the network records
- Water main disinfection and pressure testing before service
Out of scope
- Generic asset commissioning and handover to maintenance (see BC-680.10.20)
- Telecommunications build acceptance and handover (see BC-1420.10.40)
- Executing switching in the control room (see BC-1530.30)
Realized by · 0
- No product in the catalog yet.
Used in · 0
- Not yet placed on a value stream.
Build it · 1
- technology Geospatial & Network Models via BC-1520.20.30
Decomposes into · 4
- BC-1520.20.10Pre-Energization TestingTest insulation, protection settings, phasing and earthing on new equipment and record the results before it goes live.
- BC-1520.20.20Energization RequestsRequest and coordinate the switching that connects new network to the live system at an agreed time.
- BC-1520.20.30As-Built Network RecordsPost what was actually built to the network model and maps promptly so operators and planners see it.
- BC-1520.20.40Main Disinfection & TestingFlush, disinfect, pressure test and sample new water mains so they pass quality checks before customers are supplied.