    02 — Capability · BC-1520.20

    Network Commissioning & Energization

    Confirm that newly built or rebuilt network is tested, recorded and safe before it is energized or put into service, and that it joins the operational network without surprises.

    • Energization
    • Charging of Mains
    • Network Cut-Over

    In scope

    • Pre-energization tests and inspection
    • Switching requests to connect new network
    • As-built updates to the network records
    • Water main disinfection and pressure testing before service

    Out of scope

    • Generic asset commissioning and handover to maintenance (see BC-680.10.20)
    • Telecommunications build acceptance and handover (see BC-1420.10.40)
    • Executing switching in the control room (see BC-1530.30)