{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1520.20","name":"Network Commissioning & Energization","level":2,"parent_id":"BC-1520","l1_id":"BC-1520","industry":"utilities","macro_id":null,"path":["Network Construction & Field Work","Network Commissioning & Energization"],"description":"Confirm that newly built or rebuilt network is tested, recorded and safe before it is energized or put into service, and that it joins the operational network without surprises.","aliases":["Energization","Charging of Mains","Network Cut-Over"],"in_scope":["Pre-energization tests and inspection","Switching requests to connect new network","As-built updates to the network records","Water main disinfection and pressure testing before service"],"out_of_scope":["Generic asset commissioning and handover to maintenance (see BC-680.10.20)","Telecommunications build acceptance and handover (see BC-1420.10.40)","Executing switching in the control room (see BC-1530.30)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1520.20.10","BC-1520.20.20","BC-1520.20.30","BC-1520.20.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[{"id":"TR-50.60","name":"Geospatial & Network Models","domain_id":"TR-50","via":"BC-1520.20.30"}]},"ancestors":[{"id":"BC-1520","name":"Network Construction & Field Work","level":1}],"children":[{"id":"BC-1520.20.10","name":"Pre-Energization Testing","level":3,"child_count":0},{"id":"BC-1520.20.20","name":"Energization Requests","level":3,"child_count":0},{"id":"BC-1520.20.30","name":"As-Built Network Records","level":3,"child_count":0},{"id":"BC-1520.20.40","name":"Main Disinfection & Testing","level":3,"child_count":0}]}