02 — Capability · BC-1160
Plant & Process Safety
Run each manufacturing site so that nobody is hurt by its machines, chemicals or process conditions, with the controls, rehearsed responses and floor-level habits that keep a plant safe between inspections.
- Site EHS
- Plant Safety
- Industrial Safety
- Plant Safety & Environmental Compliance
In scope
- Machine and chemical hazard control on the shop floor
- Process hazard analysis for high-hazard operations
- Emergency preparedness and response at the plant
- Plant safety observation, near-miss reporting and leading indicators
Out of scope
- Enterprise health and safety policy, permits to work, energy isolation and contractor safety (see BC-810)
- Environmental permits, monitoring, reporting and waste (see BC-820)
- Site access control, guarding and theft prevention (see BC-840)
Realized by · 9 (6 high confidence)
- Cority · Incident ManagementcoreEvidence confidence: high via BC-1160.60.10
- Cority · Chemical ManagementstrongEvidence confidence: high via BC-1160.20.10
- Sphera · Incident and Action ManagementcoreEvidence confidence: high via BC-1160.60.10
- Sphera · Audits, Inspections and ObservationscoreEvidence confidence: high via BC-1160.60.40
- Sphera · PHA-Pro and FMEA-ProcoreEvidence confidence: high via BC-1160.20.30
- Sphera · Chemical ManagementcoreEvidence confidence: high via BC-1160.20.10
- Cority · Industrial HygienecoreEvidence confidence: medium via BC-1160.20.40
- Cority · Risk AssessmentstrongEvidence confidence: medium via BC-1160.10.10
- Cority · Audits and InspectionsstrongEvidence confidence: medium via BC-1160.60.40
Used in · 1
- Plan-to-Produce · 04 Execute Production via BC-1160.10
Build it · 0
- Nothing in the library points here yet.
Governed by · 1
- Top · Decomposes into
- C1BC-1160.10 Machine Safety
- C2BC-1160.20 Chemical & Process Safety
- C3BC-1160.50 Emergency Preparedness & Response
- C4BC-1160.60 Safety Observation & Reporting
- Middle · Realized by
- P1Cority · Incident Management
- P2Cority · Industrial Hygiene
- P3Cority · Risk Assessment
- P4Cority · Audits and Inspections
- P5Cority · Chemical Management
- P6Sphera · Incident and Action Management
- P7Sphera · Audits, Inspections and Observations
- +2 more in Plan
- Base · Build it
- Nothing in the library points here yet.
Value streams, frameworks, principles, data and events for this capability are in the Plan view.
Decomposes into · 4
- BC-1160.10Machine SafetyMake the plant's equipment safe to operate, clean and clear through risk assessment, guarding, interlocks and operating procedures that match the machine as it is today.
- BC-1160.20Chemical & Process SafetyControl the chemicals and process conditions in the plant so that storage, handling, reactions and releases stay inside their designed limits and people know what they are working with.
- BC-1160.50Emergency Preparedness & ResponseBe ready for a fire, release, injury or utility failure at the site with trained responders, working equipment, rehearsed plans and the means to evacuate and account for everyone.
- BC-1160.60Safety Observation & ReportingBuild the habits that keep people safe between inspections: hazards and near misses reported without fear, work observed as it is actually done, and leading indicators tracked before the injury rate moves.