03 — Value stream · VS-380
Forecast-to-Balance
Carry an operating day on the bulk power system from load and renewable forecasts through unit commitment, interchange and real-time balancing to a secure system and settled schedules. Where Outage-to-Restoration (VS-240) restores customers after a distribution fault, this keeps generation and load matched within the grid's limits.
- Operating Day Cycle
- Plan-to-Balance
- Day-Ahead-to-Real-Time
- 01
Forecast Load & Renewables
VS-380.10Forecast load and wind and solar output for the operating day by hour and area.
- 02
Commit & Schedule
VS-380.20Commit units, or offer them to the market operator that commits them, submit schedules and agree interchange with neighboring balancing areas.
- 03
Study the Day
VS-380.30Study the planned dispatch and outages against operating limits and adjust before the day starts.
- 04
Balance in Real Time
VS-380.40Keep generation and interchange matched to load, holding frequency and flows within limits as conditions change.
- 05
Recover from Contingencies
VS-380.50Deploy reserves after a unit or line trips, relieve overloads, call demand response and, in an emergency, direct load shedding.
- 06
Settle & Review
VS-380.60Reconcile actual against scheduled energy, settle imbalance and review events for lessons and standards evidence.