Skip to content
Blueprint Catalog

    ↑↓ move · Enter open · Esc close

    02 — Capability · BC-1590.20

    Balancing & Interchange

    Keep generation and scheduled interchange matched to load second by second within the balancing area, hold frequency within limits and keep enough reserves to recover from the loss of a large unit.

    • Balancing Authority
    • Frequency Control
    • Load-Frequency Control

    In scope

    • Automatic generation control and area control error
    • Scheduled interchange with neighboring balancing areas
    • Operating and regulating reserves, and directing load relief in energy emergencies

    Out of scope

    • Plant output setpoints and unit commitment (see BC-1540.10)
    • Energy schedules nominated as a market participant (see BC-1570.20.20)

    Decomposes into · 3