02 — Capability · BC-1110.20
Plant Material Flow
Move raw materials, components and work in process through the plant so every work center has what it needs and nothing is lost, double-counted or found a week later behind a rack.
- Intralogistics
- Line-Side Supply
- Material Handling
In scope
- Receiving into the plant and put-away to point of use
- Line-side replenishment and kitting
- Work-in-process tracking between operations
- Finished-goods staging for shipment
Out of scope
- Warehouse operations outside the plant walls (see BC-650)
- Inbound and outbound transportation (see BC-660)
Realized by · 0
- No product in the catalog yet.
Used in · 1
Build it · 0
- Nothing in the library points here yet.
Decomposes into · 4
- BC-1110.20.10Line-Side ReplenishmentKeep each work center stocked with the parts it consumes, pulled on signal rather than pushed in bulk, so operators build instead of fetch.
- BC-1110.20.20Kitting & StagingAssemble the set of parts and consumables a work order needs and stage it where the work will happen before the order is released.
- BC-1110.20.30Work-in-Process TrackingKnow where every partly built unit is, which operations it has passed and how long it has waited, at the level of detail the product needs.
- BC-1110.20.40Finished-Goods StagingMove completed product off the line, confirm it against the order and hold it ready for release to the warehouse or the truck.