{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1110.20","name":"Plant Material Flow","level":2,"parent_id":"BC-1110","l1_id":"BC-1110","industry":"manufacturing","macro_id":null,"path":["Plant Operations","Plant Material Flow"],"description":"Move raw materials, components and work in process through the plant so every work center has what it needs and nothing is lost, double-counted or found a week later behind a rack.","aliases":["Intralogistics","Line-Side Supply","Material Handling"],"in_scope":["Receiving into the plant and put-away to point of use","Line-side replenishment and kitting","Work-in-process tracking between operations","Finished-goods staging for shipment"],"out_of_scope":["Warehouse operations outside the plant walls (see BC-650)","Inbound and outbound transportation (see BC-660)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1110.20.10","BC-1110.20.20","BC-1110.20.30","BC-1110.20.40"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.30","stage":"Procure & Stage Materials","order":3,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1110","name":"Plant Operations","level":1}],"children":[{"id":"BC-1110.20.10","name":"Line-Side Replenishment","level":3,"child_count":0},{"id":"BC-1110.20.20","name":"Kitting & Staging","level":3,"child_count":0},{"id":"BC-1110.20.30","name":"Work-in-Process Tracking","level":3,"child_count":0},{"id":"BC-1110.20.40","name":"Finished-Goods Staging","level":3,"child_count":0}]}