    02 — Capability · BC-1590.40

    System Restoration & Black Start

    Be able to rebuild the power system after a wide-area blackout, with a current restoration plan, black start resources that are proven to work, and operators who have practiced it.

    • Black Start
    • Grid Restoration Planning
    • System Recovery

    In scope

    • Restoration plans, cranking paths and priorities
    • Testing black start units and their paths
    • Restoration drills and simulator training

    Out of scope

    • Restoring customers after local faults and storms (see BC-1530.20, BC-1580.50)
    • Enterprise crisis leadership during a blackout (see BC-830.40)