{"version":"0.18.0","built_at":"2026-10-16T10:40:38.130Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1590.40","name":"System Restoration & Black Start","level":2,"parent_id":"BC-1590","l1_id":"BC-1590","industry":"utilities","macro_id":null,"path":["Transmission System Operations","System Restoration & Black Start"],"description":"Be able to rebuild the power system after a wide-area blackout, with a current restoration plan, black start resources that are proven to work, and operators who have practiced it.","aliases":["Black Start","Grid Restoration Planning","System Recovery"],"in_scope":["Restoration plans, cranking paths and priorities","Testing black start units and their paths","Restoration drills and simulator training"],"out_of_scope":["Restoring customers after local faults and storms (see BC-1530.20, BC-1580.50)","Enterprise crisis leadership during a blackout (see BC-830.40)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1590.40.10","BC-1590.40.20","BC-1590.40.30"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1590","name":"Transmission System Operations","level":1}],"children":[{"id":"BC-1590.40.10","name":"Restoration Plan Upkeep","level":3,"child_count":0},{"id":"BC-1590.40.20","name":"Black Start Resource Testing","level":3,"child_count":0},{"id":"BC-1590.40.30","name":"Restoration Drills & Training","level":3,"child_count":0}]}