02 — Capability · BC-1120.30
Detailed Scheduling
Sequence work orders on specific lines, machines and shifts within real constraints, so changeovers are minimized, due dates are met and the floor receives a schedule it can actually run.
- Finite Scheduling
- Line Sequencing
- Shop Floor Scheduling
In scope
- Constraint-based sequencing of orders per resource
- Changeover and campaign optimization
- Labor and tooling assignment in the schedule
- Schedule publication to the floor
Out of scope
- Dispatching and running the published schedule (see BC-1110.10)
Realized by · 0
- No product in the catalog yet.
Used in · 1
Build it · 0
- Nothing in the library points here yet.
Decomposes into · 4
- BC-1120.30.10Order SequencingOrder the work on each resource to meet due dates while respecting setup rules, material availability and tool life.
- BC-1120.30.20Changeover OptimizationGroup and sequence similar products to cut setup time and waste, trading a little lateness for a lot of capacity where it pays.
- BC-1120.30.30Resource AssignmentMatch each scheduled order to the crew, fixtures and tooling it needs on that shift, flagging any that are double-booked.
- BC-1120.30.40Schedule PublicationFreeze and release the schedule to the floor at a known time each day, with changes after that point made deliberately and visibly.