{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.30","name":"Detailed Scheduling","level":2,"parent_id":"BC-1120","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Detailed Scheduling"],"description":"Sequence work orders on specific lines, machines and shifts within real constraints, so changeovers are minimized, due dates are met and the floor receives a schedule it can actually run.","aliases":["Finite Scheduling","Line Sequencing","Shop Floor Scheduling"],"in_scope":["Constraint-based sequencing of orders per resource","Changeover and campaign optimization","Labor and tooling assignment in the schedule","Schedule publication to the floor"],"out_of_scope":["Dispatching and running the published schedule (see BC-1110.10)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1120.30.10","BC-1120.30.20","BC-1120.30.30","BC-1120.30.40"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.20","stage":"Schedule Production","order":2,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1}],"children":[{"id":"BC-1120.30.10","name":"Order Sequencing","level":3,"child_count":0},{"id":"BC-1120.30.20","name":"Changeover Optimization","level":3,"child_count":0},{"id":"BC-1120.30.30","name":"Resource Assignment","level":3,"child_count":0},{"id":"BC-1120.30.40","name":"Schedule Publication","level":3,"child_count":0}]}