02 — Capability · BC-630.10
Production Scheduling
Sequence work on each line, machine and crew within the plan the network gave it, so changeovers are few, due dates are met and bottlenecks run without starving.
- Detailed Scheduling
- Shop Floor Scheduling
- Dispatching
In scope
- Finite sequencing of orders on resources
- Work order release and dispatch
- Rescheduling in response to disruption
Out of scope
- Master production schedule across sites (see BC-610)
Realized by · 1
Used in · 1
Build it · 0
- Nothing in the library points here yet.
Decomposes into · 3
- BC-630.10.10Finite SchedulingSequence production orders on specific resources with real constraints — setup, tooling, labor, material availability — rather than infinite capacity.
- BC-630.10.20Work Order ReleaseRelease orders to the floor only when material, instructions and resources are confirmed, so work starts and finishes instead of starting and waiting.
- BC-630.10.30Schedule AdjustmentRe-sequence quickly and visibly when a machine fails, material is late or a priority order lands, and tell everyone affected.