Skip to content
Blueprint Catalog

    ↑↓ move · Enter open · Esc close

    02 — Capability · BC-1590.10.30

    Operating Limit Control

    Watch transmission flows against system and interconnection operating limits and direct redispatch, switching or load relief before any limit is breached.

    • Congestion Relief
    • SOL and IROL Monitoring