Skip to content
Blueprint Catalog

    ↑↓ move · Enter open · Esc close

    02 — Capability · BC-1550.10.20

    Meter Exchange Execution

    Replace failed, obsolete or out-of-test meters with the removal and installation reads captured, so no consumption is lost between the two.

    • Meter Change
    • Meter Swap