02 — Capability · BC-1230.40
Resilience & Capacity Engineering
Design and prove that the product survives component failure, traffic spikes and regional loss, and that it has the headroom for next quarter's customers.
- Chaos Engineering
- Load Testing
- Disaster Recovery
In scope
- Failure injection and game days
- Load and performance testing against targets
- Multi-region failover and recovery drills
- Capacity headroom planning per service
Out of scope
- Platform cost optimization (see BC-1210)
- Company-wide crisis management (see BC-830)
Realized by · 0
- No product in the catalog yet.
Used in · 0
- Not yet placed on a value stream.
Build it · 5
Decomposes into · 4
- BC-1230.40.10Failure Injection & Game DaysDeliberately break things in controlled conditions to find out what actually happens before a customer does.
- BC-1230.40.20Performance & Load TestingPush the product past expected peak and measure where it degrades, so limits are known rather than discovered.
- BC-1230.40.30Disaster Recovery for the ProductDefine recovery objectives per service, maintain the failover path and prove it works on a schedule.
- BC-1230.40.40Capacity Headroom PlanningKeep enough spare capacity for growth and failure scenarios, and know how long it takes to add more.