{"version":"0.13.0","built_at":"2026-10-13T01:09:27.433Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","value_stream":{"id":"VS-260","name":"Plan-to-Energize","industries":["utilities"],"description":"Turn a forecast need, a regulatory commitment or a queue of connections into new or reinforced network assets in service, with their cost approved and recovered through rates, a price control or tariffs. Where Acquire-to-Retire (VS-210) follows any asset through its life, this stream runs from network planning through regulated cost recovery.","outcome":"The new or reinforced asset is in service, recorded and maintained, and its cost is approved and being recovered.","trigger":"A load forecast shows a constraint, a regulatory commitment falls due, or the connection queue needs capacity the network lacks.","aliases":["Plan-to-Build","Capital Delivery (Utilities)","Network Investment Lifecycle","Plan-Build-Energize"],"stages":[{"id":"VS-260.10","order":1,"name":"Forecast Need","description":"Project load, generation and water demand by area and find where and when the network will fall short.","capability_ids":["BC-1510.10","BC-1510.50","BC-1510.20"]},{"id":"VS-260.20","order":2,"name":"Choose the Solution","description":"Compare building, non-wires alternatives and flexibility, and pick the option with the best cost and risk over the asset's life.","capability_ids":["BC-1510.40","BC-1530.40","BC-680.60"]},{"id":"VS-260.30","order":3,"name":"Plan & Seek Approval","description":"Place the project in the regulated capital plan and win approval for it in the rate case or price control.","capability_ids":["BC-1510.40","BC-1580.10","BC-180.10"]},{"id":"VS-260.40","order":4,"name":"Design & Build","description":"Design the works, secure rights and permits, buy materials and services, and build to the design.","capability_ids":["BC-1520.10","BC-680.70","BC-620.20"]},{"id":"VS-260.50","order":5,"name":"Commission & Energize","description":"Test, energize and hand the new assets to operations, with the network records and asset register updated.","capability_ids":["BC-1520.20","BC-680.10","BC-1530.30"]},{"id":"VS-260.60","order":6,"name":"Recover the Cost","description":"Report the spend and outcomes to the regulator and bring the asset into rates or allowed revenue.","capability_ids":["BC-1580.10","BC-1560.20","BC-220.30"]}]}}