{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-680.20","name":"Maintenance Strategy & Planning","level":2,"parent_id":"BC-680","l1_id":"BC-680","industry":"cross-industry","macro_id":"MC-60","path":["Asset & Maintenance","Maintenance Strategy & Planning"],"description":"Decide how each asset should be maintained — run to failure, on a schedule, on condition — and plan the work so it is done with the right parts, skills and window.","aliases":["Maintenance Planning","Reliability-Centered Maintenance"],"in_scope":["Maintenance strategy per asset class","Preventive maintenance plans and schedules","Work planning and estimating and kitting","Shutdown and outage planning"],"out_of_scope":["Production scheduling that grants the maintenance window (see BC-630)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-680.20.10","BC-680.20.20","BC-680.20.30","BC-680.20.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-680","name":"Asset & Maintenance","level":1}],"children":[{"id":"BC-680.20.10","name":"Maintenance Strategy Definition","level":3,"child_count":0},{"id":"BC-680.20.20","name":"Preventive Maintenance Scheduling","level":3,"child_count":0},{"id":"BC-680.20.30","name":"Work Planning & Kitting","level":3,"child_count":0},{"id":"BC-680.20.40","name":"Shutdown & Outage Planning","level":3,"child_count":0}]}