{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-650.30","name":"Inbound Operations","level":2,"parent_id":"BC-650","l1_id":"BC-650","industry":"cross-industry","macro_id":"MC-60","path":["Inventory & Warehousing","Inbound Operations"],"description":"Get arriving goods off the truck, checked and into a known location fast enough that they are available to promise the same day.","aliases":["Receiving","Put-Away","Dock Management"],"in_scope":["Dock scheduling and yard management","Receiving inspection and labeling","Put-away to directed locations","Cross-docking"],"out_of_scope":["Order-to-invoice matching of the receipt (see BC-620)","Inbound carrier management (see BC-660)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-650.30.10","BC-650.30.20","BC-650.30.30"]},"crosswalk":{"realized_by":[{"product_id":"PR-110","product":"SAP S/4HANA","pc_id":"PC-110.50","pc":"Supply Chain","maturity":"strong","via":null}],"used_in":[{"vs_id":"VS-30","vs":"Procure-to-Pay","stage_id":"VS-30.40","stage":"Receive & Verify","order":4,"via":null},{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.30","stage":"Procure & Stage Materials","order":3,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-650","name":"Inventory & Warehousing","level":1}],"children":[{"id":"BC-650.30.10","name":"Dock & Yard Scheduling","level":3,"child_count":0},{"id":"BC-650.30.20","name":"Receiving & Inspection","level":3,"child_count":0},{"id":"BC-650.30.30","name":"Put-Away & Slotting","level":3,"child_count":0}]}