{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-610.20.30","name":"Capacity Planning","level":3,"parent_id":"BC-610.20","l1_id":"BC-610","industry":"cross-industry","macro_id":"MC-60","path":["Demand & Supply Planning","Supply Planning","Capacity Planning"],"description":"Compare planned load against available labor, machine and supplier capacity over the horizon and flag where the plan cannot be met.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-610","name":"Demand & Supply Planning","level":1},{"id":"BC-610.20","name":"Supply Planning","level":2}],"children":[]}