{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-550.30","name":"Inspection & Testing","level":2,"parent_id":"BC-550","l1_id":"BC-550","industry":"cross-industry","macro_id":"MC-50","path":["Quality","Inspection & Testing"],"description":"Check incoming materials, in-process work and finished output against their acceptance criteria and record the result, so only conforming product moves on.","aliases":["Quality Control","QC","Inspection"],"in_scope":["Incoming in-process and final inspection","Laboratory and functional testing of product","Inspection results and certificates of conformance","Release and hold decisions"],"out_of_scope":["Development-stage verification testing (see BC-530)","Shop-floor inspection execution in regulated plants (see BC-1140)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-550.30.10","BC-550.30.20","BC-550.30.30","BC-550.30.40"]},"crosswalk":{"realized_by":[{"product_id":"PR-110","product":"SAP S/4HANA","pc_id":"PC-110.40","pc":"Manufacturing","maturity":"core","via":null}],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-550","name":"Quality","level":1}],"children":[{"id":"BC-550.30.10","name":"Incoming Inspection","level":3,"child_count":0},{"id":"BC-550.30.20","name":"In-Process Inspection","level":3,"child_count":0},{"id":"BC-550.30.30","name":"Final Inspection & Release","level":3,"child_count":0},{"id":"BC-550.30.40","name":"Quality Laboratory Testing","level":3,"child_count":0}]}