{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-540.30.30","name":"Effectivity & Cut-In","level":3,"parent_id":"BC-540.30","l1_id":"BC-540","industry":"cross-industry","macro_id":"MC-50","path":["Product Lifecycle & Information","Engineering Change Control","Effectivity & Cut-In"],"description":"Set the date, serial or lot from which a change applies and coordinate the switch so old and new parts are not mixed by accident.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-540","name":"Product Lifecycle & Information","level":1},{"id":"BC-540.30","name":"Engineering Change Control","level":2}],"children":[]}