{"version":"0.18.0","built_at":"2026-10-16T10:40:38.130Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1590.30","name":"Transmission Outage Coordination","level":2,"parent_id":"BC-1590","l1_id":"BC-1590","industry":"utilities","macro_id":null,"path":["Transmission System Operations","Transmission Outage Coordination"],"description":"Plan and approve outages of transmission lines and substations so work can go ahead without leaving the system insecure, coordinated with neighboring owners and the reliability coordinator.","aliases":["Outage Coordination","Transmission Outage Scheduling","Planned Outage Approval"],"in_scope":["Outage requests for transmission equipment","Outage studies against expected conditions","Coordination of outage timing with neighbors and the coordinator"],"out_of_scope":["Scheduling the maintenance work itself (see BC-680.20.40)","Carrying out the switching and clearances for an outage (see BC-1590.10.40)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1590.30.10","BC-1590.30.20","BC-1590.30.30"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1590","name":"Transmission System Operations","level":1}],"children":[{"id":"BC-1590.30.10","name":"Transmission Outage Requests","level":3,"child_count":0},{"id":"BC-1590.30.20","name":"Outage Security Studies","level":3,"child_count":0},{"id":"BC-1590.30.30","name":"Regional Outage Coordination","level":3,"child_count":0}]}