{"version":"0.18.0","built_at":"2026-10-16T10:40:38.130Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1590.30.20","name":"Outage Security Studies","level":3,"parent_id":"BC-1590.30","l1_id":"BC-1590","industry":"utilities","macro_id":null,"path":["Transmission System Operations","Transmission Outage Coordination","Outage Security Studies"],"description":"Study each planned outage against expected load and generation so it can proceed without violating limits, or move it to a safer window.","aliases":["Next-Day Studies","Outage Assessment"],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1590","name":"Transmission System Operations","level":1},{"id":"BC-1590.30","name":"Transmission Outage Coordination","level":2}],"children":[]}