{"version":"0.18.0","built_at":"2026-10-16T10:40:38.130Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1590.10","name":"Transmission Real-Time Operations","level":2,"parent_id":"BC-1590","l1_id":"BC-1590","industry":"utilities","macro_id":null,"path":["Transmission System Operations","Transmission Real-Time Operations"],"description":"Know the real-time state of the transmission network, test it continuously against the loss of any element, and act before flows breach the limits that keep the system secure.","aliases":["EMS Operations","Transmission Control Center","Real-Time Security Assessment"],"in_scope":["State estimation from transmission telemetry","Real-time contingency analysis","Monitoring flows against system operating limits and directing relief","Switching and safety clearances on transmission equipment"],"out_of_scope":["Distribution network monitoring and alarms (see BC-1530.10)","Distribution switching and clearances (see BC-1530.30)","Physical security monitoring of substations (see BC-840.30.30)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1590.10.10","BC-1590.10.20","BC-1590.10.30","BC-1590.10.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1590","name":"Transmission System Operations","level":1}],"children":[{"id":"BC-1590.10.10","name":"State Estimation","level":3,"child_count":0},{"id":"BC-1590.10.20","name":"Real-Time Contingency Analysis","level":3,"child_count":0},{"id":"BC-1590.10.30","name":"Operating Limit Control","level":3,"child_count":0},{"id":"BC-1590.10.40","name":"Transmission Switching & Clearances","level":3,"child_count":0}]}