{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1540.10","name":"Plant Dispatch & Scheduling","level":2,"parent_id":"BC-1540","l1_id":"BC-1540","industry":"utilities","macro_id":null,"path":["Generation & Treatment Operations","Plant Dispatch & Scheduling"],"description":"Decide which utility plants run, when and at what output, so generation meets demand and market commitments and treatment works meet expected flows at the lowest overall cost.","aliases":["Generation Scheduling","Economic Dispatch","Merit Order Scheduling"],"in_scope":["Day-ahead and intraday unit commitment","Real-time output instructions to plants","Bids, offers and instructions with the system or market operator","Treatment works production scheduling"],"out_of_scope":["Manufacturing master production schedules (see BC-1120.10 Plant Master Scheduling)","Dispatching field service technicians to jobs (see BC-1180.50.10 Service Dispatch & Scheduling)","Detailed production scheduling in manufacturing (see BC-630.10)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1540.10.10","BC-1540.10.20","BC-1540.10.30","BC-1540.10.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1540","name":"Generation & Treatment Operations","level":1}],"children":[{"id":"BC-1540.10.10","name":"Unit Commitment Planning","level":3,"child_count":0},{"id":"BC-1540.10.20","name":"Real-Time Plant Dispatch","level":3,"child_count":0},{"id":"BC-1540.10.30","name":"Market Operator Scheduling","level":3,"child_count":0},{"id":"BC-1540.10.40","name":"Treatment Works Production Scheduling","level":3,"child_count":0}]}