{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1530.30","name":"Switching & Clearance","level":2,"parent_id":"BC-1530","l1_id":"BC-1530","industry":"utilities","macro_id":null,"path":["Network Operations & Control","Switching & Clearance"],"description":"Change network configuration safely by planning, approving and carrying out switching programs, and issue clearances that protect people working on equipment from it being energized.","aliases":["Switching Operations","Safety Clearances","Switching Orders"],"in_scope":["Planned switching program preparation","Switching execution and confirmation","Clearances, tags and safety documents","The as-operated network model"],"out_of_scope":["Workplace safety rules and lockout programs in general (see BC-810)","Scheduling of planned maintenance outages (see BC-680.20.40)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1530.30.10","BC-1530.30.20","BC-1530.30.30","BC-1530.30.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1530","name":"Network Operations & Control","level":1}],"children":[{"id":"BC-1530.30.10","name":"Switching Program Preparation","level":3,"child_count":0},{"id":"BC-1530.30.20","name":"Switching Execution & Confirmation","level":3,"child_count":0},{"id":"BC-1530.30.30","name":"Safety Clearance Issuance","level":3,"child_count":0},{"id":"BC-1530.30.40","name":"As-Operated Network Model","level":3,"child_count":0}]}