{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1520.20.20","name":"Energization Requests","level":3,"parent_id":"BC-1520.20","l1_id":"BC-1520","industry":"utilities","macro_id":null,"path":["Network Construction & Field Work","Network Commissioning & Energization","Energization Requests"],"description":"Request and coordinate the switching that connects new network to the live system at an agreed time.","aliases":["Cut-In Requests","Connection Switching Requests"],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1520","name":"Network Construction & Field Work","level":1},{"id":"BC-1520.20","name":"Network Commissioning & Energization","level":2}],"children":[]}