{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1510","name":"Network Planning & Investment","level":1,"parent_id":null,"l1_id":"BC-1510","industry":"utilities","macro_id":null,"path":["Network Planning & Investment"],"description":"Know where load, generation and water demand will grow, what the network can carry, and which connections and capital projects are needed, so the utility builds the right assets in the right places and can justify the spend to its regulator. Corporate strategy and generic capital budgeting sit elsewhere.","aliases":["Grid Planning","Distribution Planning","Network Investment Planning","System Planning"],"in_scope":["Load, peak and water demand forecasts for the network","Network models, power flow and hosting capacity analysis","Interconnection requests and studies for generators and customer energy resources","Regulated capital plans and long-term water resource plans"],"out_of_scope":["Forecasting product demand for sales and operations planning (see BC-610.10)","Asset-by-asset replacement and renewal planning (see BC-680.60.30)","Corporate capital budgeting and allocation (see BC-220.10.40)","Corporate strategy and long-range business direction (see BC-110)"],"csdm_note":"Record as a Business Capability realized by load forecasting, network modeling, interconnection queue and capital planning Business Applications, often fed by the geographic network model; align it to the planning and connections Business Services rather than to operational ones.","status":"active","successor_id":null,"child_ids":["BC-1510.10","BC-1510.20","BC-1510.30","BC-1510.40","BC-1510.50"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[{"id":"TR-50.60","name":"Geospatial & Network Models","domain_id":"TR-50","via":"BC-1510.20"}]},"ancestors":[],"children":[{"id":"BC-1510.10","name":"Load Forecasting","level":2,"child_count":4},{"id":"BC-1510.20","name":"Network Modeling & Hosting Capacity","level":2,"child_count":4},{"id":"BC-1510.30","name":"Interconnection Queue & Studies","level":2,"child_count":4},{"id":"BC-1510.40","name":"Regulated Capital Plan","level":2,"child_count":4},{"id":"BC-1510.50","name":"Water Supply & Resource Planning","level":2,"child_count":4}]}