{"version":"0.12.1","built_at":"2026-10-12T10:56:26.035Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1510.30","name":"Interconnection Queue & Studies","level":2,"parent_id":"BC-1510","l1_id":"BC-1510","industry":"utilities","macro_id":null,"path":["Network Planning & Investment","Interconnection Queue & Studies"],"description":"Take requests to connect generators, storage and customer energy resources, study their effect on the network, and offer connection terms in a fair and timely order.","aliases":["Generator Interconnection","DER Interconnection","Grid Connection Applications"],"in_scope":["Queue intake, position and milestones for connection requests","Screening and detailed system impact studies","Network upgrade cost allocation and connection offers","Coordination with the ISO, RTO, TSO or DSO on transmission-level requests"],"out_of_scope":["Net metering and export tariffs for customer generation (see BC-1570)","Building the network upgrades once agreed (see BC-1520)","New service connections for ordinary customer load (see BC-1560.10)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1510.30.10","BC-1510.30.20","BC-1510.30.30","BC-1510.30.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[],"technology":[]},"ancestors":[{"id":"BC-1510","name":"Network Planning & Investment","level":1}],"children":[{"id":"BC-1510.30.10","name":"Interconnection Request Intake","level":3,"child_count":0},{"id":"BC-1510.30.20","name":"Interconnection Screening","level":3,"child_count":0},{"id":"BC-1510.30.30","name":"System Impact Studies","level":3,"child_count":0},{"id":"BC-1510.30.40","name":"Connection Offers & Agreements","level":3,"child_count":0}]}