{"version":"0.5.0","built_at":"2026-10-11T12:53:59.099Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1430.40","name":"Planned Network Maintenance","level":2,"parent_id":"BC-1430","l1_id":"BC-1430","industry":"communications","macro_id":null,"path":["Network Operations & Assurance","Planned Network Maintenance"],"description":"Make network changes and upgrades inside agreed maintenance windows with the least customer impact and a tested way back if they go wrong.","aliases":["Maintenance Windows","Network Change Control","Scheduled Works"],"in_scope":["Maintenance window scheduling and conflict checks","Risk review and rollback plans for network changes","Advance notice to affected customers and partners"],"out_of_scope":["Change enablement for internal IT systems (see BC-740.30)","Preventive maintenance of non-network assets (see BC-680.30)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1430.40.10","BC-1430.40.20","BC-1430.40.30"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1430","name":"Network Operations & Assurance","level":1}],"children":[{"id":"BC-1430.40.10","name":"Maintenance Window Scheduling","level":3,"child_count":0},{"id":"BC-1430.40.20","name":"Network Change Risk Review","level":3,"child_count":0},{"id":"BC-1430.40.30","name":"Planned Work Notification","level":3,"child_count":0}]}