{"version":"0.5.0","built_at":"2026-10-11T12:53:59.099Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1420.10","name":"Network Construction","level":2,"parent_id":"BC-1420","l1_id":"BC-1420","industry":"communications","macro_id":null,"path":["Network Build & Field Operations","Network Construction"],"description":"Build fiber, cable, towers, small cells and hubs to the approved design, manage the crews and contractors doing it, and accept the work only when it is complete and documented.","aliases":["Outside Plant Construction","Network Build","Deployment Program"],"in_scope":["Build program scheduling and job sequencing","Aerial, underground and site construction","Contractor oversight and quality inspection","As-built documentation and handover to operations"],"out_of_scope":["Construction of corporate offices and facilities (see BC-370)","Contractor sourcing and contracts (see BC-640.20)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1420.10.10","BC-1420.10.20","BC-1420.10.30","BC-1420.10.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1420","name":"Network Build & Field Operations","level":1}],"children":[{"id":"BC-1420.10.10","name":"Build Program Scheduling","level":3,"child_count":0},{"id":"BC-1420.10.20","name":"Outside Plant Construction","level":3,"child_count":0},{"id":"BC-1420.10.30","name":"Cell Site Construction","level":3,"child_count":0},{"id":"BC-1420.10.40","name":"Build Acceptance & Handover","level":3,"child_count":0}]}