{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1150.50","name":"Continuous Improvement System","level":2,"parent_id":"BC-1150","l1_id":"BC-1150","industry":"manufacturing","macro_id":null,"path":["Industrial Engineering & Continuous Improvement","Continuous Improvement System"],"description":"Run the plant's improvement engine: capture ideas and losses, pick the problems worth solving, solve them with a disciplined method and hold the gain so the plant is better next year than last.","aliases":["Kaizen","Lean Program","Problem Solving System"],"in_scope":["Loss analysis and improvement prioritization","Structured problem solving and improvement events","Idea capture and recognition","Benefit tracking and standard updates"],"out_of_scope":["Enterprise improvement methodology and certification (see BC-190)","Capital projects that improvements justify (see BC-180)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1150.50.10","BC-1150.50.20","BC-1150.50.30","BC-1150.50.40","BC-1150.50.50"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.70","stage":"Review Performance","order":7,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1150","name":"Industrial Engineering & Continuous Improvement","level":1}],"children":[{"id":"BC-1150.50.10","name":"Loss Analysis & Prioritization","level":3,"child_count":0},{"id":"BC-1150.50.20","name":"Structured Problem Solving","level":3,"child_count":0},{"id":"BC-1150.50.30","name":"Improvement Events","level":3,"child_count":0},{"id":"BC-1150.50.40","name":"Idea Capture & Recognition","level":3,"child_count":0},{"id":"BC-1150.50.50","name":"Benefit Tracking","level":3,"child_count":0}]}