{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1140.10","name":"Inspection & Test","level":2,"parent_id":"BC-1140","l1_id":"BC-1140","industry":"manufacturing","macro_id":null,"path":["Manufacturing Quality & Compliance","Inspection & Test"],"description":"Check materials, work in process and finished product against their specifications at the planned points, with results recorded so that every accepted unit has evidence behind it.","aliases":["Quality Inspection","Receiving Inspection","Final Test"],"in_scope":["Incoming material inspection and skip-lot rules","In-process checks and first-piece approval","Final inspection and functional test","Laboratory testing of samples"],"out_of_scope":["Deciding what the specification should be (see BC-530)","Supplier corrective action for failed receipts (see BC-640)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1140.10.10","BC-1140.10.20","BC-1140.10.30","BC-1140.10.40"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.50","stage":"Control Quality","order":5,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1140","name":"Manufacturing Quality & Compliance","level":1}],"children":[{"id":"BC-1140.10.10","name":"Incoming Inspection","level":3,"child_count":0},{"id":"BC-1140.10.20","name":"In-Process Inspection","level":3,"child_count":0},{"id":"BC-1140.10.30","name":"Final Inspection & Test","level":3,"child_count":0},{"id":"BC-1140.10.40","name":"Laboratory Testing","level":3,"child_count":0}]}