{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1130.40.40","name":"Shutdown & Turnaround Planning","level":3,"parent_id":"BC-1130.40","l1_id":"BC-1130","industry":"manufacturing","macro_id":null,"path":["Maintenance & Reliability","Maintenance Planning & Scheduling","Shutdown & Turnaround Planning"],"description":"Plan major outages months ahead as a single project of scope, sequence, contractors and critical path, with scope creep controlled.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1130","name":"Maintenance & Reliability","level":1},{"id":"BC-1130.40","name":"Maintenance Planning & Scheduling","level":2}],"children":[]}