{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1130.20","name":"Preventive & Predictive Maintenance","level":2,"parent_id":"BC-1130","l1_id":"BC-1130","industry":"manufacturing","macro_id":null,"path":["Maintenance & Reliability","Preventive & Predictive Maintenance"],"description":"Carry out time-based and condition-based tasks that stop failures before they stop the line, using inspection, lubrication, monitoring and replacement at the intervals the strategy set.","aliases":["PM Program","Condition Monitoring","Predictive Maintenance"],"in_scope":["Preventive task scheduling and execution","Condition monitoring and inspection rounds","Predictive alerts and their triage","Program effectiveness review"],"out_of_scope":["Repairs raised by a failure already in progress (see BC-1130.30)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1130.20.10","BC-1130.20.20","BC-1130.20.30","BC-1130.20.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1130","name":"Maintenance & Reliability","level":1}],"children":[{"id":"BC-1130.20.10","name":"Preventive Task Execution","level":3,"child_count":0},{"id":"BC-1130.20.20","name":"Condition Monitoring","level":3,"child_count":0},{"id":"BC-1130.20.30","name":"Predictive Alert Triage","level":3,"child_count":0},{"id":"BC-1130.20.40","name":"Program Effectiveness Review","level":3,"child_count":0}]}