{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120","name":"Production Planning & Scheduling","level":1,"parent_id":null,"l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling"],"description":"Decide what each plant will make, in what quantity and in what order, so that customer demand is met with the capacity, materials and labor actually available rather than the ones the forecast hoped for.","aliases":["Production Scheduling","Master Production Scheduling","Plant Planning","Finite Scheduling"],"in_scope":["The master production schedule per plant and its rough-cut capacity check","Material requirements and the purchase and production orders they trigger","Detailed, finite scheduling of lines and work centers","Schedule execution control, including expediting and re-sequencing"],"out_of_scope":["Enterprise demand forecasting and the sales and operations plan (see BC-610)","Executing the schedule on the floor (see BC-1110)","Buying the materials the plan calls for (see BC-620)"],"csdm_note":"Usually realized by a planning or advanced-scheduling Business Application whose Application Service feeds the execution system; the dependency between the two is the one worth modeling first.","status":"active","successor_id":null,"child_ids":["BC-1120.10","BC-1120.20","BC-1120.30","BC-1120.40","BC-1120.50"]},"crosswalk":{"realized_by":[{"product_id":"PR-110","product":"SAP S/4HANA","pc_id":"PC-110.40","pc":"Manufacturing","maturity":"core","via":"BC-1120.20"}],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.20","stage":"Schedule Production","order":2,"via":"BC-1120.10"},{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.40","stage":"Execute Production","order":4,"via":"BC-1120.40"}],"patterns":[],"stacks":[],"books":[]},"ancestors":[],"children":[{"id":"BC-1120.10","name":"Master Production Scheduling","level":2,"child_count":4},{"id":"BC-1120.20","name":"Material & Capacity Requirements","level":2,"child_count":4},{"id":"BC-1120.30","name":"Detailed Scheduling","level":2,"child_count":4},{"id":"BC-1120.40","name":"Schedule Control & Expediting","level":2,"child_count":3},{"id":"BC-1120.50","name":"Production Data Foundations","level":2,"child_count":4}]}