{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.50","name":"Production Data Foundations","level":2,"parent_id":"BC-1120","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Production Data Foundations"],"description":"Own the routings, bills of materials, work-center definitions and calendars that every plan is computed from, and keep them accurate as products and equipment change.","aliases":["Manufacturing Master Data","Routings & BOMs","Work Center Data"],"in_scope":["Manufacturing bill of materials and routing upkeep","Work center, resource and calendar definitions","Standard times and yields","Engineering change incorporation into planning data"],"out_of_scope":["Engineering product structure and design changes (see BC-540)","Enterprise master data governance (see BC-750)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1120.50.10","BC-1120.50.20","BC-1120.50.30","BC-1120.50.40"]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1}],"children":[{"id":"BC-1120.50.10","name":"Routing & Bill of Materials Upkeep","level":3,"child_count":0},{"id":"BC-1120.50.20","name":"Work Center & Calendar Definition","level":3,"child_count":0},{"id":"BC-1120.50.30","name":"Standard Time Maintenance","level":3,"child_count":0},{"id":"BC-1120.50.40","name":"Engineering Change Incorporation","level":3,"child_count":0}]}