{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.30.10","name":"Order Sequencing","level":3,"parent_id":"BC-1120.30","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Detailed Scheduling","Order Sequencing"],"description":"Order the work on each resource to meet due dates while respecting setup rules, material availability and tool life.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1},{"id":"BC-1120.30","name":"Detailed Scheduling","level":2}],"children":[]}