{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.20","name":"Material & Capacity Requirements","level":2,"parent_id":"BC-1120","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Material & Capacity Requirements"],"description":"Explode the build plan into the components, labor and machine hours it needs, and surface the shortages and overloads early enough to do something about them.","aliases":["MRP","Requirements Planning","Capacity Planning"],"in_scope":["Material requirements explosion and planned order creation","Rough-cut and detailed capacity checks","Shortage and overload exception handling","Planning parameter upkeep such as lead times and lot sizes"],"out_of_scope":["Supplier selection and purchase order negotiation (see BC-620)","Long-range capacity investment decisions (see BC-630)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1120.20.10","BC-1120.20.20","BC-1120.20.30","BC-1120.20.40"]},"crosswalk":{"realized_by":[{"product_id":"PR-110","product":"SAP S/4HANA","pc_id":"PC-110.40","pc":"Manufacturing","maturity":"core","via":null}],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.20","stage":"Schedule Production","order":2,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1}],"children":[{"id":"BC-1120.20.10","name":"Material Requirements Explosion","level":3,"child_count":0},{"id":"BC-1120.20.20","name":"Capacity Requirements Check","level":3,"child_count":0},{"id":"BC-1120.20.30","name":"Exception Resolution","level":3,"child_count":0},{"id":"BC-1120.20.40","name":"Planning Parameter Maintenance","level":3,"child_count":0}]}