{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.20.40","name":"Planning Parameter Maintenance","level":3,"parent_id":"BC-1120.20","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Material & Capacity Requirements","Planning Parameter Maintenance"],"description":"Keep lead times, lot sizes, safety stocks and yields close to observed reality, since the plan is only as good as they are.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1},{"id":"BC-1120.20","name":"Material & Capacity Requirements","level":2}],"children":[]}