{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.10","name":"Master Production Scheduling","level":2,"parent_id":"BC-1120","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Master Production Scheduling"],"description":"Commit each plant to a time-phased build plan by product family and item that honors the demand plan, inventory targets and the plant's demonstrated capacity.","aliases":["MPS","Build Plan","Plant Production Plan"],"in_scope":["Time-phased build plan by item and plant","Allocation of volume across plants that make the same product","Available-to-promise and planning time fences","Monthly plan reconciliation with the demand plan"],"out_of_scope":["The demand plan itself (see BC-610)","Daily sequencing of the lines (see BC-1120.30)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1120.10.10","BC-1120.10.20","BC-1120.10.30","BC-1120.10.40"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.20","stage":"Schedule Production","order":2,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1}],"children":[{"id":"BC-1120.10.10","name":"Build Plan Development","level":3,"child_count":0},{"id":"BC-1120.10.20","name":"Plant Allocation","level":3,"child_count":0},{"id":"BC-1120.10.30","name":"Time Fence Management","level":3,"child_count":0},{"id":"BC-1120.10.40","name":"Available-to-Promise","level":3,"child_count":0}]}