{"version":"0.2.0","built_at":"2026-10-10T23:54:35.067Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1120.10.10","name":"Build Plan Development","level":3,"parent_id":"BC-1120.10","l1_id":"BC-1120","industry":"manufacturing","macro_id":null,"path":["Production Planning & Scheduling","Master Production Scheduling","Build Plan Development"],"description":"Set the quantity of each item to make per period at each plant, balancing demand, inventory policy and the cost of changing level.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1120","name":"Production Planning & Scheduling","level":1},{"id":"BC-1120.10","name":"Master Production Scheduling","level":2}],"children":[]}