{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1110.30.30","name":"Labor & Machine Time Capture","level":3,"parent_id":"BC-1110.30","l1_id":"BC-1110","industry":"manufacturing","macro_id":null,"path":["Plant Operations","Production Recording & Traceability","Labor & Machine Time Capture"],"description":"Capture who worked on what and how long each machine ran per order, accurately enough to cost the job and size the next one.","aliases":[],"in_scope":[],"out_of_scope":[],"csdm_note":null,"status":"active","successor_id":null,"child_ids":[]},"crosswalk":{"realized_by":[],"used_in":[],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1110","name":"Plant Operations","level":1},{"id":"BC-1110.30","name":"Production Recording & Traceability","level":2}],"children":[]}