{"version":"0.2.0","built_at":"2026-10-10T20:58:14.188Z","license":"CC BY 4.0 © Mike Reams","canonical":"https://catalog.mikereams.com","capability":{"id":"BC-1110.10","name":"Shop Floor Execution","level":2,"parent_id":"BC-1110","l1_id":"BC-1110","industry":"manufacturing","macro_id":null,"path":["Plant Operations","Shop Floor Execution"],"description":"Turn released work orders into finished units by running lines, cells and work centers to the schedule, with operators, machines and instructions in the right place at the right time.","aliases":["Line Operations","Work Order Execution","Cell Operations"],"in_scope":["Work order dispatch and sequencing at the line","Operator assignment and shift staffing","Changeover and setup execution","Line-side problem escalation"],"out_of_scope":["Deciding what the line should run and when (see BC-1120)","Fixing a broken machine (see BC-1130)"],"csdm_note":null,"status":"active","successor_id":null,"child_ids":["BC-1110.10.10","BC-1110.10.20","BC-1110.10.30","BC-1110.10.40"]},"crosswalk":{"realized_by":[],"used_in":[{"vs_id":"VS-90","vs":"Plan-to-Produce","stage_id":"VS-90.40","stage":"Execute Production","order":4,"via":null}],"patterns":[],"stacks":[],"books":[]},"ancestors":[{"id":"BC-1110","name":"Plant Operations","level":1}],"children":[{"id":"BC-1110.10.10","name":"Work Order Dispatch","level":3,"child_count":0},{"id":"BC-1110.10.20","name":"Shift Operations","level":3,"child_count":0},{"id":"BC-1110.10.30","name":"Changeover Execution","level":3,"child_count":0},{"id":"BC-1110.10.40","name":"Line Escalation","level":3,"child_count":0}]}